Logo
  • Home
  • ·Media
  • ·The Descent freediving underwater editorial feature
Freediver descending underwater in dark open water captured from below with typography overlay reading The Descent

Long Lead Brand Identity 2021

About

This underwater editorial frame captures a freediver descending vertically into dark, deep ocean waters, shot from directly below. The composition emphasizes the vast scale and somber atmosphere of the open sea with natural ambient light filtering down from the surface. Bold serif typography reading The Descent is centered horizontally across the frame. The project is produced under the Long Lead brand identity with photography by Daan Verhoeven.

Brand

Project

Keywords

Credits

Styles

Techniques

Background

Ocean

Context

Editorial
Similar media
Cinematic wide shot of dark ocean waters under a heavy stormy sky with white typographic title text reading KINGDOM centered across the frame.
Spreading pages of a publication titled The Depths Below featuring underwater imagery and a diver in swim cap and goggles.
Black and white photograph showing a television screen displaying an underwater scene with dark rocky formations and tiny figures by Ari Marcopoulos
Close-up of a person torso in low-key lighting with smoke and atmospheric mist against a dark background.
Monochrome underwater photograph of multiple figures submerged beneath churning white splashes and bubbles.
Model wearing a diving mask and pearl earrings submerged in the ocean with the word KAILIS on the left
Profile portrait of a person with a shaved head wearing a dark tank top in profile view against a dimly lit blue-toned background.
Close-up of a person floating peacefully in thermal water with gentle ripples at Opuke Thermal Pools and Spa.
Black and white underwater portrait of a figure floating in dark water with overlaid white text reading KEVIN FRILET
Close-up of a person floating on their back in dark, rippling water with reflections distorting the surface.
Monochrome image of ocean waves washing over a sandy beach with centered Giorgio Armani text overlay
Overhead view of a person swimming in dark water with rippling caustic light patterns across their submerged body.
Woman floating on her back in dark swirling ocean water captured by photographer Sylve Colless