Logo
  • Home
  • ·Media
  • ·Long Lead underwater diver brand identity visual
A diver descending into deep blue ocean water captured by underwater photography for Long Lead brand identity.

Long Lead Brand Identity 2021

About

This underwater image captures a diver descending into deep blue ocean water. The composition focuses on the solitary figure moving through the water column against a natural marine environment. Natural lighting illuminates the scene through the water's surface, highlighting subtle textures in the surrounding water. The project was created for Long Lead with photography by Daan Verhoeven and creative direction by Natalie Matutschovsky.

Brand

Project

Keywords

Credits

Styles

Techniques

Background

Ocean

Context

Brand Film / Corporate Video
Similar media
Black and white photograph showing a television screen displaying an underwater scene with dark rocky formations and tiny figures by Ari Marcopoulos
Surfer on a longboard sitting on the ocean waters, photographed in Los Angeles by John Schell.
Surfer riding a wave on a surfboard under a clear blue sky, captured from a low angle in the water.
Sam Corlett featured in a multi-panel portrait series shot through a weathered glass window for Numero Netherlands.
A completely black image frame with no visible subjects, objects, or details.
Solid black frame with no visible content or detail
Man in yellow shirt and dark trousers standing on a balcony with glass reflections, photographed by Clayton Cotterell.
A surfer seated on a surfboard in the calm open ocean with visible film grain and text overlay reading A Day With Nick Fouquet.
Woman in a black wetsuit holding a surfboard in ocean waters under a clear sky
Man with blonde hair seen from behind wearing a brown shirt looking out at palm trees, the ocean, and distant coastal hills.
Giant silhouette of a dog head looms in the foreground above a group of people swimming in a lake beneath cloudy skies.
Person floating on their back in the ocean with water gently washing over their face and outstretched arms.
High-angle view overlooking a tropical coastline, sandy beach, and palm trees from a modern infinity pool with clear blue water.
Woman wading in calm crystal clear ocean water with small tropical islands under a blue cloudy sky photographed by Sean Izzard.