Logo

Long Lead Brand Identity 2021

About

This video piece from Long Lead features atmospheric aerial sequences of ocean water accompanied by editorial narrative text overlays exploring themes of freediving and mental resilience. Created with story by Xan Rice and photo and video direction by Daan Verhoeven, the project integrates graphic design and audio production elements. The visual style utilizes natural muted tones and cinematic pacing to present an immersive documentary aesthetic.

Brand

Project

Keywords

Credits

Styles

Techniques

Industries

Background

Ocean

Context

Brand Film / Corporate Video
Similar media
Spreading pages of a publication titled The Depths Below featuring underwater imagery and a diver in swim cap and goggles.
Black and white photograph showing a television screen displaying an underwater scene with dark rocky formations and tiny figures by Ari Marcopoulos
A woman swimming in the ocean with clear water rippling around her shoulders.
Model wearing a diving mask and pearl earrings submerged in the ocean with the word KAILIS on the left
Close-up of a person floating on their back in dark, rippling water with reflections distorting the surface.
Editorial spread with infographics, numbers, and graphic branding elements by NAMENAME Creative Partners